Chapter 01 — Packages

Construction packages that fit your budget, without compromise

Pick a base package and upgrade finishes later. Every plan includes disciplined supervision, documented QA/QC checkpoints, and clear BOQ scope.

Package pricing is guidance. Final rate is confirmed after site visit, drawings and material selections.

Illustration — project planning & BOQ scope

Chapter 02 — Why Our Packages

Why our packages feel different

Many builders show a single rate and hide the scope. We do the opposite: we show structure, inclusions, quality checks and milestone payments clearly so you can compare and decide confidently.

Clear BOQ scope

You know what’s included, what’s optional, and what upgrades change the final cost.

QA/QC checkpoints

Stage-wise quality checks reduce rework, improve finishing, and protect your investment.

Timeline discipline

We track progress by milestones and share updates so delivery doesn’t drift quietly.

Chapter 03 — Compare Packages

Choose your package

All packages include RCC structure, branded cement/steel, standard MEP, waterproofing in wet areas and QA/QC. Upgrade finishes and interiors later using add-ons.

Inclusions Basic ₹1,999 / sq ft Standard ₹2,249 / sq ft Most Popular Premium ₹2,499 / sq ft Luxury ₹2,999 / sq ft
Structure
RCC structure with branded steel & cement
Enhanced structure specs + anti-termite treatment
Superior structure + advanced waterproofing approach
Finishes
Vitrified tiles (2x2) + standard bath fittings
Premium tiles (2x4 options), branded sanitary range
Premium tiles (Kajaria/So many)
Large-format tiles / engineered flooring options
MEP & openings
Electrical & plumbing with ISI materials
Concealed wiring + modular switches (Orbit/Kundan)
Designer bath fittings
Designer bath fittings + premium electricals
Basic doors/windows + putty + emulsion paint
Laminated doors, UPVC windows, premium paint
Veneer/teak options + premium UPVC/Aluminium
Execution
Site supervision + progress updates
QA/QC audits + seepage warranty focus
Priority site management + extended support
Estimate Basic Standard Premium Luxury
  • RCC structure with branded steel & cement
  • Vitrified tiles (2x2) + standard bath fittings
  • Electrical & plumbing with ISI materials
  • Basic doors/windows + putty + emulsion paint
  • Site supervision + progress updates
Estimate with Basic
  • Enhanced structure specs + anti-termite treatment
  • Premium tiles (2x4 options), branded sanitary range
  • Concealed wiring + modular switches (Orbit/Kundan)
  • Laminated doors, UPVC windows, premium paint
  • QA/QC audits + seepage warranty focus
Estimate with Standard
  • Enhanced structure specs + anti-termite treatment
  • Premium tiles (Kajaria/So many)
  • Designer bath fittings
  • Laminated doors, UPVC windows, premium paint
  • QA/QC audits + seepage warranty focus
Estimate with Premium
  • Superior structure + advanced waterproofing approach
  • Large-format tiles / engineered flooring options
  • Designer bath fittings + premium electricals
  • Veneer/teak options + premium UPVC/Aluminium
  • Priority site management + extended support
Estimate with Luxury

We’ll confirm final inclusions in your BOQ after site visit and requirement discussion.

Chapter 04 — How It Works

How it works

Simple steps, clear BOQ, milestone payments, and QA/QC checks from start to handover.

  1. 1

    Free site visit

    We assess site access, requirements, and prepare an execution plan.

  2. 2

    BOQ + timeline

    Itemized inclusions, brands and milestone schedule you can verify.

  3. 3

    Execution

    Supervision, safety and daily photo updates on construction progress.

  4. 4

    Quality handover

    Snag list closure, cleaning, documentation and post-handover support.

Chapter 05 — Milestone Payments

Milestone-based payments

This is how real construction businesses build trust. Payments are linked to measurable stages, not vague promises.

Milestone Stage examples Typical %
Booking advance Site setup, contract finalization, drawings kickoff 15%
Mobilization Initial setup and resource movement 10%
Foundation Excavation, PCC, footing, plinth beams 15%
Structure Columns, slab casting, staircase, curing 15%
Walls & MEP Brickwork, electrical and plumbing rough-ins 20%
Finishes Flooring, painting, doors/windows and fixtures 20%
Handover Snag fixes, cleaning, keys, documentation 5%

Percentages are indicative. Final milestone schedule depends on project scope and timeline.

Chapter 06 — Scope

Inclusions & exclusions

Transparent scope reduces disputes. We highlight what is normally included in a BOQ and what depends on drawings, approvals and selections.

Common inclusions

Included in most packages

  • RCC structure (cement/steel as per BOQ)
  • Masonry work (brick/block based on design)
  • Standard electrical & plumbing (MEP)
  • Flooring (as per package level)
  • Putty + painting (as per package level)
  • Waterproofing in wet areas (basic scope)
  • Site supervision + progress updates
  • Stage-wise QA/QC checks

Exact SKUs are finalized with you and documented in BOQ.

Depends on site / approvals

Typically excluded / additional

  • Approval fees, govt charges, liaisoning charges
  • Compound wall, sump, borewell, water connection
  • Lift, DG, solar, rainwater harvesting (if required)
  • Loose furniture, appliances, décor items
  • Soil improvement / piling (if soil condition demands)
  • Unexpected underground obstructions / demolition scope
  • Premium upgrades beyond BOQ selection

We explain these upfront so you don’t get surprises later.

Chapter 07 — Quality

QA/QC checklist (sample)

This is the “engineering layer” most websites hide. We show it because quality is not a slogan, it’s a process.

Structure & Masonry

  • Steel quantity & spacing check before casting
  • Shuttering alignment + level verification
  • Concrete mix checks + curing schedule
  • Brick/block alignment + plumb check
  • Plaster thickness + surface flatness

Waterproofing & Finishes

  • Bathroom/kitchen waterproofing test
  • Tile slope check for drainage areas
  • Electrical load distribution & earthing check
  • Plumbing pressure test / leakage verification
  • Painting finish consistency + final snag list

This is a sample checklist. Actual checkpoints depend on scope, floors and site conditions.

Chapter 08 — Plan Your Investment

Instant cost estimator (approx.)

Get a quick ballpark. Final cost depends on drawings, soil, approvals and customization.

Built-up area

Enter your total built-up area and number of floors.

* Estimator is for guidance only. Exact quotation after site visit & final selections.

Next Step

Want a detailed BOQ for your plot?

Share your built-up area and floor plan. We’ll give a clear BOQ with timeline, inclusions and milestones.

Book free site visit WhatsApp now Estimate again
Before You Begin

FAQs

Structure + standard MEP + basic finishes per package. Exact brands and SKUs are finalized in BOQ after site visit and selections.
It’s a guidance number based on package rate and area. Final cost depends on soil, drawings, site access, finish selections and approvals.
Yes. You can upgrade tiles, sanitary, switches, doors and interiors. All upgrades are documented clearly in BOQ before execution.
Warranty scope depends on package and BOQ terms. We focus on seepage prevention, finishing QC and documented handover.